Got the SMB beds filled with pea gravel today. Added three beds made from cut-off plastic barrel ends, one at a vacant end on each side of the pond and one inside the log cabin. A cairn was added to Skull Island (see edited first post).
Here is one of the nicer looking SMB beds, completed:
Here is one of the barrel-end beds: