Thanks FishinRod,

Duty cycles is exactly what I am researching at the moment haha.

The run is roughly 220 feet with 47 feet of elevation to overcome. The goal is to run the pump system 2 to 4 times until I reach full pool, then hopefully less frequently. The total dynamic head is 62ft using 2" discharge line.

There are several ways do to this. I love the idea of clean water. (it's not cleared yet with all the construction). My first idea would be a large 18" standpipe with a 6" casing and pea gravel between the two for a fitler. I'm also considering the biomass balls used in a self-contained water feature pond.Then use a continuous-duty well pump or a high-head submersible pump to move the water. This would require a small dock so I would have access to set and maintain the pump.

I'm going to use the overlflow to snake 2" rolled pipe discharge line. This will also give me the option of running my gas powered 120gpm if I want to move a lot of water in a short period and it will serve as my temp solution until I figure out the permanent one.

Last edited by HTNFSH2; 07/12/23 08:58 AM.