|
Forums36
Topics40,963
Posts557,993
Members18,503
|
Most Online3,612 Jan 10th, 2023
|
|
2 members (Boondoggle, LeighAnn),
1,042
guests, and
210
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: Sep 2022
Posts: 6
|
OP
Joined: Sep 2022
Posts: 6 |
Essup and Sunil, Absolutely! just getting started with the structure. If i remember correctly from info on this site, we need roughly 20% of acerage of the pond to be structure? Trying to work from deep to shallow to keep up with the filling up. We put 4 logs in, raised up on stone a couple feet off the bottom...big rain storm came in and we didnt get finished securing the logs...3 weeks later (this past weekend) i had to go wading to get them back in place and secured! We've got lots more materials for sturcture. I'm trying to get a nice balance of plastic and wood for the remaining structure. Most of the rock/concrete is in place now...hopefully! We need to work on seeding the back side of the dam as well as around the pond water edge. We plan on putting in a small boat ramp as well. Lots to do! Thanks for any and all input!
Ty
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|