Essup and Sunil, Absolutely! just getting started with the structure. If i remember correctly from info on this site, we need roughly 20% of acerage of the pond to be structure? Trying to work from deep to shallow to keep up with the filling up. We put 4 logs in, raised up on stone a couple feet off the bottom...big rain storm came in and we didnt get finished securing the logs...3 weeks later (this past weekend) i had to go wading to get them back in place and secured! We've got lots more materials for sturcture. I'm trying to get a nice balance of plastic and wood for the remaining structure. Most of the rock/concrete is in place now...hopefully! We need to work on seeding the back side of the dam as well as around the pond water edge. We plan on putting in a small boat ramp as well. Lots to do! Thanks for any and all input!

Ty