I figured out how to eliminate approximately 90% of the submerged weeds without spending an arm and a leg. There was a 15-20 foot I inch galvanized steel pipe laying in the old barn. We tied 4 support lines to the pipe connected to a shackle. The shackle was connected to the rope that ran through the pulley tied off to the utv. The rope was then tied to the rack on the atv. The pipe was put on the front of the Jon boat trolled out to where we wanted to drop it in the water. After the pipe was dropped I tied the length of rope that ran through the pulley to the atv with a bowline knot. I drove the atv at 0-1 mph until the pipe with weed was on the shore. It was a continuous repeat of that same process until we removed what we wanted. Once all the weed and muck was on the bank we loaded up the waste on the tractor bucket and moved below the pond dam. Hopefully the addition of 15-20 GC this fall will make this an obsolete process in the years that follow.