I hear ya on the water level and fall behind the dam. There is some fall and eventually the water would go into a creek. So I’m just trying to think ahead of what I would like to have in place while it is being built. Just thought in the unlikely event I need to drop water level significantly what is the best option.Being it’s being dug I maybe limited on options.