Forums36
Topics40,944
Posts557,788
Members18,483
|
Most Online3,612 Jan 10th, 2023
|
|
1 members (Croakin' Toad),
717
guests, and
265
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: Jan 2009
Posts: 28,508 Likes: 829
Moderator Ambassador Field Correspondent Lunker
|
Moderator Ambassador Field Correspondent Lunker
Joined: Jan 2009
Posts: 28,508 Likes: 829 |
That's a good question and I don't have a concrete answer for you. I was talking to my cousin and planning 12 ponds each 1/4 acre and 2 ponds each 1/2 acre, max depth on the 1/4 acre ponds was 5'-6', 1/2 acre ponds 9 feet, shaped like a paint roller tray with 3:1 sides, 1/4 of the length of the pond at 1:4 then dropping @ 1:3 to max depth and holding that as long as possible. Ponds would be around 120' long. He said to get a D8 with a ripper and it'd take 2-3 weeks. BUT he's run heavy equipment all his life and has spent many hours on a dozer. He worked in the worlds largest open pit coal mine in Wy, running those HUGE machines. The one dragline had a 100 yd bucket and the smaller one had an 80 yd bucket.....
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|