liquidsquid, I haven't looked at the post in a couple weeks, so thanks for the reply. We did dig 7 test holes down 8' and didn't hit slate, and the plan is to only dig 6' at most. It has been so wet that the contractor I was hoping would do it said he was booked through next summer, even with the DEC OK. Thanks for the encouragement.