It's been a month since Contractor #2 has left the premises. He determined that the pond was leaking through a layer of old pond junk material that was under the new dam and never removed. We put in a new much larger and deeper core trench in front of the dam, repacked and feathered in. 300 series machines and rock trucks make for quick work.

We raised the bottom of the "problem area, 15k square feet" by 2ft and I applied 4x the recommended dosage of soil floc polymer on top covering about 20k square feet. No sooner did the deep end get completed and we had a rain event that created a pool. They got finished and we had about 1.5" drop from hurricane Ida. Just ten miles south of me got 6 inches of rain. frown

After a month, we are holding the same amount of water except for a little loss from evaporation.