been delayed but keeping up with it on a separate forum that isn't a time suck to get content up.

For the full monty please check here -> Stressless updated thread

Wanted to share here as there was some discussion on where and how for bentonite.

Got the dozer in, only slightly stuck once this AM, dig'em deep, pile'em high! (AF Red Horse motto) New dam at the North end of the pond..

Bentonite pumper on line waiting to schedule 📅

About halfway in the pond, ~1100' long avg 70' wide.

[Linked Image]


Both banks, one spoil one highwall made it inaccessible except for a nasty swampy launch at one end.

Such a treat already to be able to roll in 300+' on a 10' path!

[Linked Image]

Both banks, one spoil one highwall made it inaccessible except for a nasty swampy launch at one end.

Such a treat already to be able to roll in 300+' on a 10' path!

Few hours later N Dam taking shape...

[Linked Image]


Pic that'll reoccur... on the North dam, looking at making a shelf for bedding about 6-8' wide along parts of this... asking some forums what's the best depth for the shelf for bluegill and bass beds...

[Linked Image]

Weather has been perfect for this to get started, fingers crossed 🤞 for some more...

North end is roughed in.

Road down to the first bumpout.. the first two bumpouts should be done by end of tomorrow. Had Steve Fender stop in and give me some good advice.

[Linked Image]

[Linked Image]

Paths coming together... should be roughed in early next week

[Linked Image]

Got a bunch done on the North end and worked the South Road some as well. They'll meet in thr middle at a 17" red oak thats just above the road elevation.

A fast easy way to add structure and cover into your pond..

[video:youtube]
[/video]

Mrs and at the North Dam / road is roughed in around the inside.

[Linked Image]

Had planned for 5 bumpouts, 20x 20 or so areas to turn around on quad or UTV towing a brushhog. We decided yesterday to reduce to four about 60 yards apart and make spawing bedding benches on the four that were left based on the fill available and priorities of packing the East side highwall.

Mose brought his first helper in today so we had both the hoe and dozer working all day. Much got done. Taking a knee and back Tuesday AM- fields need rain but I need it stay off thru Wed... we'll see.

Took a little cajoling bit got them to move a bunch of fill down about 120yds where we really need it, and to set the self leveling lazer where you can see most of the road. That led to marking the entire East side for
Road height
Water level - 20"
Spawning ledge start height 2' below water height
Spawning ledge end height, 8' below water height

[Linked Image]

Last edited by Stressless; 08/13/21 09:54 AM.

8 Ponds in Mid-East Ohio, three streams that merge to 1.

Fishbowl Pond - 1.5 acre, family swimming hole, 22'
Figure 8 Pond - 1.25 acre, 12'
Crescent Pond - 2 acre 11'