If you have a good idea where the house will be built, you might be able to run electric to an "H: frame that has a meter and power shut off on it, then tie into that with a small breaker box for power at the property until you build the house. Having power there while the house is being built will make it a bit easier on the builder too.


www.hoosierpondpros.com


http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).