On my first pond, the contractor dug a trench down the future bowl to a lower area to "dewater" the pond area. I installed a bottom drain on my 3rd pond to deal with a sand lens that continuously seeped water, but the area never really dewatered. However, I would not have been able to dig it without the drain. Sounds like this is not your contractor's first rodeo.