Got a case 130 excavator and a case 750 dozer. I have some photos that I’ll compile in the end.
Sucked about 150 lbs of sand into the trash pump lines today, holy moly that was a chore.
Had to do some extra tree removal because the mud made me reroute my paths of dirt removal.
Getting to the 12 ft depth is going to be nearly impossible. As the water come in from the table, it brings lots of sand with it, causing the banks to cave in and filling the hole with sand. It can be avoided by not going steep but I’m not sure it really matters...
Advice for others: don’t disturb the ground unless your going to finish in that area quickly, after it is “uncompacted” it is much harder to move, won’t hold weight, and becomes super saturated very easily. I had a 50x20 ft waterbed this morning. It was ground that you could stand on, but waved like a bouncy house.
Still on track. Lots of work to go.