Made some more progress on the pond dock in between rains this weekend.

Son Clint helped me out and his GF Kat supervised. We applied some lessons learned while building the platform section.
The gangway section was small enough that we were able to assemble the frame on my trailer. We pre-cut the floor
joist boards and screwed it all up on the trailer deck, then hauled it out to the pond.

5/12/19
[Linked Image from i1174.photobucket.com]

I used Nanner to haul the floats to the pond bank, then picked up the dock frame, set it down on top of the floats,
squared it up and put the deck boards on.

5/12/19
[Linked Image from i1174.photobucket.com]

These sections are ready for hardware and carpet. I'm pondering whether or not I should give the deck boards a good
soaking with boiled linseed oil before I put the carpet down. Daughter's doberman must have some lab in the woodpile.
She has decided that she's a retriever...

5/12/19
[Linked Image from i1174.photobucket.com]

Last edited by Augie; 04/19/20 09:14 AM. Reason: fixing the pics