Well we got the roof all on this last weekend. Just have to do the gable end and 2 pieces on the front on each side of the doorway and both sides we are going to come down about 6 feet to keep the rain from blowing in sideways. All and all I am pretty happy with it. Just thought I would share. The far right side is where my boat will go under.


Attached Images
Pole Barn (2).jpg
Last edited by RC51; 06/22/18 02:21 PM.

The only difference between a rut and a Grave is the depth. So get up get out of that rut and get moving!! Time to work!!