Originally Posted By: gully washer
Originally Posted By: Neo07


On the emergency spillway, I am not sure clear on what you are saying, but I assume it is a spot in the dam that is higher than the exit pipe and around 2 ft less than the top of the dam.... I could possibly do that on the far right side of the dam, as it was natural hillside and not man made. So I guess if I built the dam up all the way across except for a few feet on the right side of the exit pipe that could work..?


Yes, that’s the right idea….........…. You might consult with your dirt guy about raising the dam 3' or 4'. A dozer can get it done in a few days, whereas using a tractor could take weeks.(depending on number of hours per day spent in the tractor seat) Maybe the dirt guy will feel guilty for not doing a proper build, and cut you a deal. From the pics, it certainly looks like he knows how to work dirt, and he should understand the need for some free board, and a spillway.


Ok, sounds good... well actually, the guy doing the dozer work was a friend of my sons... he had built a few ponds but had only been using a dozer for about a year. I have less than 1500.00 in the whole thing. Of course now it looks like I'm going to have to make a couple of mods, but all in all I am pleased with it. Thx.