The reno is almost complete, The old pond has been taken down about 5 ft. (approx. 300 dump trucks full). The area between the two ponds is now only 8 ft wide and I have two 2 inch pumps running trying to equalize the water depth. If all goes well Monday we will have the excavator, two dump trucks and a dozer on site to complete the job.

We have to remove the strip of land between the two ponds put down 300 ft of fabric and 3 to 4 loads of rock. The dozer has about 1/2 the berm done so that needs to be completed and then just touch up the land with the top soil that was stripped in the beginning.

I'm super happy with the quality of the job but it is defiantly going over budget.