It is a cost share, and normal around here is 50% of the first 2000 yards of dirt, but you must build the pond to their specs. Not worth it except for a small cattle watering hole, which is what the program was designed for.

Last edited by BrianL; 07/21/16 10:19 AM.

1.8 acre pond with CNBG, RES, HSB, and LMB
Trophy Hunter feeder.