Thank you. I have the advantage that I can cut off the water if I need to adjust things later. I have good clay down low, but will likely need to core one end to keep the seepage down. I have space to do this post digging if needed. I will probably see where the water level ends up from the well first. If the seepage is low, things may be OK.