Once most of the digging was done, I started working on fish structure. We had some old concrete patios around and old home place on the property that Mike broke into smaller pieces so I could handle with my smaller tractor. We got about a 2" rain which put about 1.5 feet in the bottom of the pond, but fortunately we were done with that part. WE still had some touch up work around the edges, with the point, and the upper end, and digging out the shelf a little lower.