Forums36
Topics40,998
Posts558,348
Members18,520
|
Most Online3,612 Jan 10th, 2023
|
|
11 members (Sunil, Theo Gallus, Mainer, BamaBass9, Brian from Texas, Shorthose, jludwig, Dave Davidson1, LANGSTER, highflyer, FishinRod),
1,038
guests, and
196
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
Joined: Aug 2015
Posts: 3
|
OP
Joined: Aug 2015
Posts: 3 |
snrub, The pond is new and basically a small stream that was dug out (105' x100') The dam is about 2 feet over the height of the level of the stream. The stream runs pretty slow in the summer.It is about 8 feet wide and a few inches deep. I would estimate the pond to be about 350,000-400,000 gallons and it took 10 days to fill, in the dry part of summer. In the spring, the stream is about the same width and about a 1 1/2 feet deep and a lot faster. I couldn't guess what the flow would be. The overflow is a spillway over the dam.
I have large amounts of clay and shale for dam material.
I'll try to post some pics later.
thanks, Greg
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
My First
by FishinRod - 05/09/24 11:17 AM
|
|
|
|
|
|
|
|
|
|
|
|