Well, 3 weeks until I head back out to the cabin to elk hunt. While I am there, I will take some more DO readings (this time in PPM). This will be after approx 2 months of the windmill aeration. I hope there is some improvement in the DO levels.

Best case scenario is I get a solar rig up there next summer. Run it all summer and into the winter as long as I can. I know I can get someone up there a couple times a month at least until Decemberish to check on it, knock any snow/ice off, etc. Then go into winter with as high of DO as possible and hope the windmill keeps a hole open.

I sure hope the DO levels look better when I get there next month.


Keep This Forum Viable, Read Pond Boss Magazine -
America's Journal of Pond Management