Was on site this morning before work. Riser is in as of yesterday. The ground was frozen a bit this morning but the sun should loosen things up today. Objective is to get 3-4 feet of clay over the concrete anti seep collars that we poured yesterday and run the pans to get 5 feet or so of compacted core down good.

A second pan is coming in around noon and the sheeps foot is ready to roll. Had a setback on the second pan with a starter problem but should be solved quickly. I dumped a bunch of rocks in the output of the creek to keep down erosion that I picked up with the tractor this morning.

I see now to first post in the gallery and then link to the gallery.

I am north of Gainesville GA.

We should be working tomorrow also.

Last edited by Swiss; 02/06/15 12:32 PM.

2.5 Acre Pond
Status: Design