Jeff and the stick were out on Friday to work clearing willows around the pond near the boating launching and ice fishing drive-on area. When that project is completed there will be some photos. There is some loader work and snow fence installing to do.

Yesterday, I removed the Barge, the irrigation system, and installed the circulator on the ramp.

During the winter it is time for a some work on the Barge in dry dock. I am installing a new deck (Trex) and will be doing a small amount of maintenance. The Barge has been on the water since April 2008 and the deck shows it. It is still physically sound but showing the stress of the elements.

In case you have forgotten The Pond Barge Sage





Life is Good on Bremer Pond

Bremer Pond Weather