Had at least one request for an update on this pond, so on this nasty outside day will try and bring the project up to date. I've failed to keep it up to date.

Pictures below of final finish of rock lining before filling with water. The rock is all crushed limestone.

Part of rocked area is 2-3" size cleaned lateral (septic tank system) rock and the rest is AB3 which is about 1" and all the fines below that size, which contains a lot of ag lime in the fines.

Hopefully rock will supply spawning areas for RES and hiding areas for PK shrimp.

This should supply all the lime needed for the naturally acidic clay. End of March 2014 completion.

Attached Images
001.JPG 008.JPG
Last edited by snrub; 10/12/14 01:49 PM.

John

I subscribe to Pond Boss Magazine