Here is what I would do I think. Have a bottom layer of concrete blocks as the foundation with steel rebar or 2x4's running through the holes and tied so they stay flat. Stack and tie the rest of the blocks to the foundation and tied. Then on top tie a truck inter tube to the top of the blocks. When the blocks drop through the ice the tube should keep them upright as they drop to the bottom.