My pit is about 19 acres of water. The deepest part is about 20 feet, it also has quite a bit of shallow water. The land is still pretty rough, the spoil piles are all overgrown with trees, and it makes a pretty interesting landscape. It would be nice to have a dozer to re-arrange some of the hills.

This is a link to previous post:
http://forums.pondboss.com/ubbthreads.php?ubb=showflat&Main=20027&Number=258257#Post258257

Thanks
John

Last edited by KingRace78; 10/30/13 01:00 PM.