My thoughts and believe these are included in the thread - these are my beach construction plans:
Dig beach area down 12" Apply landscape fabric to reduce weed growth and prevent mixing of sand with clay and use landscaping staples to secure [be sure to overlap material] Build 6-12" ridge of clay around beach area underwater to prevent sand from spilling out of the area over time
From my notes of forum research this is plan I established. I think following these steps will ensure a long lived and clean beach area.