Brettski,
You are almost at the part I liked best, the framing. Everything before and after seemed soooo slow.

I helped my father in law do the framing on his house, he is a tool guy, and it was overall a breeze. He had a nail gun for every portion of the job.

The hardest part was the floor joist for the second floor. It was a lot of work and slow for two people. A third person to carry the joist and cut the blocks and backing would have helped a lot.

I must admit, I do like sitting here with a beer watching you work.


1/4 & 3/4 acre ponds. A thousand miles from no where and there is no place I want to be...
Dwight Yoakam