Originally Posted By: davatsa

George, if you verified the contents of the mud with the drilling contractor, would you feel comfortable spreading the mud over small, unfilled forage ponds that need a clay base? If the drilling contractor does not haul the mud offsite, is there a feasible way to test the mud and spread it ourselves?
Dave, talk to your mud logger if still on site or nearby.
The only thing I would be concerned about would be if drilled in carbonates and acidized completion.
If frac only probabley OK.

Is the mud still in the pit?

I'm geting out of my area on mud chem - I'm an exploration guy.....



N.E. Texas 2 acre and 1/4 acre ponds
Original george #173 (22 June 2002)