Biting the bullet would be the best and SAFEST solution. Any make-shift extentsion could fail and get sucked into the pipe potentially causing a severe blockage OR let such a huge, sudden outflow occur that could do some serious damage at the output area. It could even be intense enough to damage the riser section. Any of these repairs could be a lot more costly or dangerous than the cost of another pipe.