I had power run five years ago, they put in two post and a transformer. The power company just tied into the easiest route from the existing line. I just called them, the came out and measured than gave me an estimate..One thing, they do not put in your meter pole, you can do that yourself of get an electrician..The power company will then inspect it and install the meter. My cost was around $1200 for the two post and meter post..it has gone up since. AT 600', you will need four or five poles and they will probably put a transformer on the last pole before you meter pole.