OK. Foundation is complete. Once the forms were taken off, we applied a foundation water sealant since the foundation will be in constant contact with water. This crazy goop stuff was like tar. We spent an entire day applying it with rollers and were basically covered from head to toe in the crap. It required about a 1/4 inch layer. Later that night, I called my Dad and asked if he had been in the shower and he responded, "Hell yes"! I then asked if he had any luck getting the stuff off and he responded, "Hell no"!

After the foundation sealant had dried, we brought in Jerry Donner Services for the dirt work. We packed the area where the footers meet the foundation walls with clay on both the inside and outside. We then filled the inside of the foundation with clay and dirt. We will cover the dirt with a few inches of gravel. Tommorow we will continue and hopefully be finished with the dirt work. Then onto the construction of the cabin.

Scott