A well orchestrated attack. All the right equipment. A very impressive and ambitious plan. Well done.
Tell us more about the foundation plan. Stuff like: Will all the footers be below the normal pool elevation; is the plan to pour walls that reach above the emergency spillway elevation and then frame up from there; what are going to be supported by the stepped footers?