Pond Boss Magazine
https://www.pondboss.com/images/userfiles/image/20130301193901_6_150by50orangewhyshouldsubscribejpeg.jpg
Advertisment
Newest Members
shores41, MidwestCass, Bucyrus22B, Steve Clubb, macman59
18,484 Registered Users
Forum Statistics
Forums36
Topics40,947
Posts557,800
Members18,484
Most Online3,612
Jan 10th, 2023
Top Posters
esshup 28,512
ewest 21,490
Cecil Baird1 20,043
Bill Cody 15,141
Who's Online Now
13 members (FishinRod, Donatello, DrewSh, shores41, Steve Clubb, Justin W, Joe7328, catscratch, Knobber, John Folchetti, Snipe, Sunil, FireIsHot), 979 guests, and 236 robots.
Key: Admin, Global Mod, Mod
Thread Like Summary
DreamcatcherDB, DrLuke, esshup, FishinRod, RStringer
Total Likes: 8
Original Post (Thread Starter)
#543087 01/17/2022 2:31 PM
by DreamcatcherDB
DreamcatcherDB
I need to build a new dock on my family's 4 acre pond.
My other family members insists the dock must be stationary, supported by piers, to allow safe access by wheelchair.
Even if a floating dock could be stable enough, they still wouldn't feel comfortable with it. So, floating is out of the question.

I wasn't able to build this summer but I am thinking building it in winter might be easier.
This is mid-michigan. The temps have been consistently around 20 and our pond is well frozen over.
The ice is plenty thick enough to walk on and seems level enough to build directly off from.
Is there any reason (besides being a bit cold for some) that winter isn't the best time to build a stationary dock??

I have been a professional designer and builder my whole life. I am very confident with the structural aspects of my construction plan;
My plan is to build a stationary dock using 0.60 treated 6x6's set into the mucky/gravel bottom.
The dock will be almost 30 ft long and will require 16 ft posts for the depth at the farthest distance.
I figure I can simply layout the dock on the ice, drill holes and sledgehammer the posts down till they won't move.
I realize crossbracing will be required so I plan to pre-install a single bolted 2x4 to each post before sinking it down then chainsaw a slot in the ice to pivot the braces across. Next, I can set the headers directly on the ice (which should be rather level, right? I can always check and shim) then bolt them to the posts. Finally I can drop on the joists and finish the framing/decking.....all while just standing on the ice!

It seems so obvious that I am surprised it's not common practice.
In facts, it seems almost too obvious and that it gives me pause.
I did a lot of web surfing and I did find one professional dock building company in Ontario who say they build docks on the ice all the time.
But other than that I am not finding anything.
I have personally built several houses and countless decks in winter but never a dock yet.
Am I overlooking something specific to winter dock building?
Liked Replies
#551701 Aug 24th a 12:45 PM
by DreamcatcherDB
DreamcatcherDB
Following up on my dock build. Spring and early summer were wet, hot, dry, hot, etc. but finally settled down enough for me to go out and finish the dock. It turned out well! The positioning of the posts was spot on +/-1/8". I used 2x4 decking because we have a stockpile of it at the property. The dock is rock solid. The only unfortunate aspect is that the water level has actually dropped a few inches due to the drought we had but I expect it to go up soon enough. I also had a major duckweed bloom so the water looks gross. I will be working towards adding aeration soon. I hope to do some dredging along the perimeter too but that would require my dad to get the long reach excavator running so might be too big of an ask.

Anyhow, here's proof that building a dock on ice isn't only POSSIBLE but IMO, the PREFERRED method. For anyone considering a new dock, you should really consider dropping in pier posts this winter. Cheers!

[Linked Image]
[Linked Image]
[Linked Image]
Attached Images
2 members like this
#543098 Jan 17th a 04:28 PM
by Theo Gallus
Theo Gallus
Originally Posted by FishinRod
Every step sounds pretty good in winter - except using a sledgehammer to drive 6x6s into a mucky/gravel bottom.
I also don't think one can sledgehammer 6"x6"s into ground solid enough to support a structure. And putting them into soft muck or mud won't let them hold a dock.

I can use the post driver on the back of my tractor to drive 6" circular posts 4' deep into dry soil. I couldn't sledgehammer them in 2" deep.
1 member likes this
#543141 Jan 18th a 07:46 PM
by esshup
esshup
Originally Posted by FishinRod
esshup,

Washing down and driving hollow steel pipe is a whole different ballgame - and it sounds like a huge improvement for his situation.

How did you tie the wood dock elements to your steel support structure?


The wood hasn't been tied to the steel pipe at all. It sits on top of the horizontal pieces. Been sitting there without moving forever. 4' wide dock, three 2x8 stringers running the length of the dock, cross bracing of more 2x8's between the stringers (or joists). Dock is "L" shaped, roughly 60 feet long. I can't remember, but I think the pipes were installed at either 8' or 10' intervals. Decking was 2x6's, and when that deteriorated, it was changed to extruded plastic, which we found out is EXTREMELY slippery when there is snow/ice and somewhat slippery with water on it. But it is only slippery in the direction that the boards are running, which is 90° to how you usually walk on the pier.
1 member likes this
#543155 Jan 19th a 01:54 PM
by SkunkedAgain
SkunkedAgain
I don't think you believe them that the 6x6 will be too hard to drive. Let me use numbers to help you understand ... If you look at the area of the pipe you are driving approximately 1.62 square inches of area compared to 36 sq in... That is 22.2 times more difficult to drive in.. If you drive the pipe with a post driver you apply around 100 lbs per hit, to drive the 6x6 post you will have to apply 2220 lbs per hit to drive it... I doubt you're that strong, so the 6x6 will sit on the mud and provide no support...

I really like the idea of building on the ice, I wish i would have done that... Instead I tried to do it from a boat and my posts ended up crooked. I just drover mine with a post driver rather than washing them and it worked okay except for not being vertical... I think if you combine the two ideas you can build a great structure and it will last a long time... I haven't had much luck with treated lumber lasting when submerged lately, unless you get the creosote treatment in ties... Another reason I'd go with the steel well casings at least they last 40 or more years... Good luck... Later J
1 member likes this
#543174 Jan 19th a 05:32 PM
by esshup
esshup
We really didn't get wet jetting in the pipes once we figured out how to do it. We just had a well pump that we used for the underground sprinkler system, and adapted the outlet to garden hose thread. Ditto for the top of the pipe (we had a manual pipe threader too). At first we tried tape and rags, or just holding the hose in the pipe with rags and that didn't work.

We installed a 75' seawall there too. We used the interlocking "W" shaped steel, either 5/16 or 3/8" thick. We washed/jetted that down too, using a piece of 1/2" or 3/4" pipe on the end of a hose. We used 8' lengths of the seawall steel, going 4'-5' down into the lake bottom because it was holding back soil. We capped it with a piece of 4"x4"x1/4" steel angle. That was installed around 1980. Still holding strong.

Now they have rubber reduction collars that are held in place with hose clamps, that might work without having to thread the pipe.

I doubt that you will be able to get enough force on the 6x6's manually to get them far enough into the bottom of the pond. To prove that to yourself, try digging a hole at the edge of the pond in a few inches of water, then try to pound a 6x6 down into the soil.

We went by the rule of thumb to have at least 1/3 of the length of pipe that stuck up out of the bottom of the pond into the bottom of the lake, going up to at least 1/2 the length (or more) when installing in shallow water.

We also found out that by installing a martin house on a pole that was attached to one of the pipes that was holding up one corner of the boat hoist was a bad idea. In one year, due to either the birds landing/taking off or the wind blowing on the martin house, combined with the down pressure of the boat that post sunk 3" over the course of a year. Our "fix" was to support the horizontal part of the boat hoist (floor jack with a piece of wood on the ice), unscrew the large pipe we slipped over the pipe we had jetted into the bottom of the lake, set a 3" long piece of pipe on top of that pipe, and re-attach the slipped over piece of pipe to the horizontal part of the hoist. AND put the martin house on it's own pipe........
1 member likes this
#543179 Jan 19th a 07:13 PM
by FishinRod
FishinRod
Originally Posted by esshup
We also found out that by installing a martin house on a pole that was attached to one of the pipes that was holding up one corner of the boat hoist was a bad idea. In one year, due to either the birds landing/taking off or the wind blowing on the martin house, combined with the down pressure of the boat that post sunk 3" over the course of a year.

Just call Esshup Engineering Consultants for all of your pile driving needs!

No more heavy construction equipment required ever again.

Call us for a quote on Purple Martin houses. Our unique designs can drive 2" steel posts to a depth of 8' in unconsolidated material.

Also ask about our Bald Eagle nests if you need to drive posts up to 4" in size. The eagles will work for free if you allow them two fish/day from your pond! laugh
1 member likes this
#551759 Aug 26th a 12:23 PM
by DreamcatcherDB
DreamcatcherDB
Haha. Yeah I did in fact modify my driving method. After much debate, I ended up putting on my mechanic's hat (I'm not actually a mechanic of any sort) and repairing my dad's long reach excavator. After I set the posts by hand, using a sledgehammer while standing on a ladder, I just had him hammer them down with the excavator bucket.

Had I not been able to repair the excavator, my backup-backup method was to borrow an electric jackhammer then, somehow, wrangle it up a ladder and jackhammer them down. Also in consideration was using my trash pump to water jet them down.

The black ABS tubing is just a conduit in case we add electrical in the future
1 member likes this
Today's Birthdays
Froggy Joe
Recent Posts
Major Fail
by FishinRod - 04/19/24 12:40 PM
Muddy pond
by shores41 - 04/19/24 12:10 PM
'Nother New Guy
by John Folchetti - 04/19/24 11:40 AM
Protecting Minnows
by esshup - 04/19/24 09:46 AM
What’s the easiest way to get rid of leaves
by esshup - 04/19/24 09:23 AM
How many channel cats in 1/5 acre pond?
by Dave Davidson1 - 04/18/24 08:41 PM
1/4 HP pond aerator pump
by esshup - 04/18/24 06:58 PM
Hi there quick question on going forward
by Joe7328 - 04/18/24 11:49 AM
Chestnut other trees for wildlife
by Augie - 04/18/24 10:57 AM
How to catch Hybrid Striper
by Augie - 04/18/24 10:39 AM
No feed HSB or CC small pond?
by esshup - 04/18/24 10:02 AM
Buying LMB
by esshup - 04/18/24 09:56 AM
Newly Uploaded Images
Eagles Over The Pond Yesterday
Eagles Over The Pond Yesterday
by Tbar, December 10
Deer at Theo's 2023
Deer at Theo's 2023
by Theo Gallus, November 13
Minnow identification
Minnow identification
by Mike Troyer, October 6
Sharing the Food
Sharing the Food
by FishinRod, September 9
Nice BGxRES
Nice BGxRES
by Theo Gallus, July 28
Snake Identification
Snake Identification
by Rangersedge, July 12

� 2014 POND BOSS INC. all rights reserved USA and Worldwide

Powered by UBB.threads™ PHP Forum Software 7.7.5