NRCS engineer is supposedly coming out to assess the situation. But, that was 3 weeks ago , so I can only guess if he will ever show up. However, my immediate concern is to fix the headcut erosion, otherwtse there won't be a pond . The dam pipe fix would most likely will need to wait until dry weather comes back, maybe even summer.