9 months after the bulldozers arrived on site: FULL POND with water exiting the spillway.[Linked Image]

Time to celebrate, so we drank a bottle of the wine we make every year.
[Linked Image]

Next up: April stocking. This took a lot longer than I thought it would/should. Glad to be here.
Attached Images