Well the water is rising as the rains come in. On Saturday I took an hour or so and cut the snags off about 4' below the anticipated high water level. I reduced the snaggs as I really don't want to use 50# braid for bluegill... wink

[Linked Image]

8F and chainsaw work made some nice working working conditions - nice to just walk out and getRdone....
[Linked Image]

Replaced the camera and getting some pics of the water rising and installed a not so secure PVC measuring element to the overflow. I plan to move the camera and level meter to get a good watch on the overflow and levels.

The pond is 11' deep throughout the 1100' and has risen about 7 feet so far.... since Aug, with a 3 month drought Aug->Oct On track for it hitting the overflow about March and that will signal the start of forage stocking.