Originally Posted by SetterGuy
That’s a lot of rock to haul with that Ranger. Are you loading it by hand? Hope not. You’re a tougher man than I.

Yes...I dunno about tougher, cheaper perhaps :-)

Triaxle delivered 22.5T, not sure how much we're putting in the bed of the Ranger each load but it has a pretty healthy squat before we go dump it and place the rock by hand.

Thankfully for me, wife and young boys are onboard with helping...loading the Ranger only takes about 5 minutes with unloading and setting another 5-7.