If a specific post was interesting or useful to you, we recommend that you Like that post. It tells the post author, and others, that you found the information valuable. Clicking Like is another way to let others know that you enjoy it without leaving a comment.
Log in to join the conversation and Like this content.
This is a follow-up to a comment on a topic introduced within a previously hijacked thread... In early March 2025, Helena and SePro initiated work with Texas Parks & Wildlife biologists on a “case study” to technically and empirically document the effects of various EutroSORB formulations on a 5 surface-acre city park pond in Katy, TX (Mary Jo Peckham Park). The park’s pond is occupied (“infested” 😉) by a relative high population of waterfowl, which do what waterfowl do best when fed ample amounts of foodstuffs by the visiting public. In 2023 & 2024, the park’s pond experienced several bouts of excessive planktonic algae blooms, often accompanied by Cyanobacteria blooms that posed a threat to both “wildlife” and park-visiting pets. The objective of the case study is to document effects & benefits associated with a properly executed phosphorus mitigation program. Lanthanum (a rare earth element) is the key component found in the various EutroSORB formulations. Use-rates for one or more formulation are more accurately based upon phosphorus sample results rather than a predesignated rate per acre or acre-foot. Accordingly, the formulation(s) and dosage(s) for this case study will be based upon collected water and benthic soil samples, which are currently undergoing analysis within SePro’s water-quality testing lab. The final results of this case study will become available this fall after the treatment(s) have concluded and several post-treatment water/soil samples are analyzed. Personally, I believe this case study will provide an excellent comparison to innumerable private ponds that suffer from the effects of excessive & long term eutrophication. I’m happy to share the case study results (later this year) with anyone who expresses an interest. UPDATE: The application was executed on Thurs/May 15th. Video linked below. Post-treatment sampling will occur at two intervals between July & October. MARY JO PECKHAM PARK / KATY TX (Phosphorus Mitigation Project)