Erosion control day today! I've been working on a clay loaf that was left when the pond was initially excavated. Managed to get it pretty close to leveled out, today capped a portion of it with 52 tons of AB3 which is still short of what it needs and one of the arborists dropped of (3) loads of chips/logs. Hoping to get the clay capped with chips, till it and then cap it again with another load of chips before we final cap it with topsoil for some grass.

The clay loaf has been slowly working it's way into the waterway that feeds the pond. I suspect this is part of the turbidity issue with our water.

I was able to get water samples while at the pond yesterday which were sent off Texas A&M today for final baseline water clearing testing. Should have a report back in a couple of weeks.

Feel like we are making pretty good progress toward better water quality.
Attached Images