Pond Boss Magazine
https://www.pondboss.com/images/userfiles/image/20130301193901_6_150by50orangewhyshouldsubscribejpeg.jpg
Advertisment
Newest Members
Kirk78, Rgv, Kalispel, TokyoTim, Mustelid
19,113 Registered Users
Forum Statistics
Forums36
Topics42,113
Posts571,660
Members19,114
Most Online13,012
Jun 7th, 2026
Top Posters
esshup 29,788
ewest 22,032
Cecil Baird1 20,043
Bill Cody 15,993
Who's Online Now
1 members (Theo Gallus), 1,026 guests, and 96 robots.
Key: Admin, Global Mod, Mod
Thread Like Summary
4CornersPuddle, jmartin
Total Likes: 2
Original Post (Thread Starter)
by jmartin
jmartin
I'm working to clear a beaver infestation in a old, spring fed lake located near Oakwood, Tx and was looking for advice on how to treat several areas where they've burrowed into my dam.

We've taken 16 beavers out over the past 3 weeks, so the problem was much more severe than expected and I'm concerned my dam now looks more like swiss cheese and needs to be shored up asap.

They have tunneled below the bulkhead in 4-6 places and I don't know how extensive their network is but I did have one dig though the top of the structure which highlighted the magnitude of the problem.

Any thoughts would be appreciated.

Thanks,
Liked Replies
by FishinRod
FishinRod
Agree with esshup on the mini-excavator.

They are quite easy to operate for a newbie.

Observations:

1.) Most mini-excavators have two "control modes". For amateurs, it is usually more intuitive to have the rental company set it up to operate in "backhoe" mode.

2.) They are safe to operate for newbies if you do NOT drive or operate on slopes. (Also only safe where there is no chance of hitting underground or overhead utilities.)

3.) I suspect you will need to operate from a flat position on top of the dam. You will need to measure how far to reach to dig out most or all of the beaver tunnels. In my experience more HP and reach is almost always better on renting a mini-excavator. The rental rate only goes up slightly as you get more HP. The work accomplished per hour versus the rental cost per hour has always been better for me with the larger machine.

My limitation is generally the hauling weight. I only have a beefed-up 1/2-ton pick up. It is flat from the rental business to our farm, so I usually get the excavator that is right at my towing weight limit.

Get the online specs for the largest machine you can haul. See if the "reach" in the specs will fit your project needs. If not, then you may need a buddy with a 1-ton truck so you can get a bigger machine (for example).

4.) Packed clay on a dam face will probably be very hard digging. In that case you want a smaller bucket to maximize your break-out force at the cutting edge. For example, if the beaver tunnels are 10" wide, I would ask the rental company to fit their 12" bucket. You will also need a bucket with teeth. Tell the rental guys your project when you reserve the machine, and they should provide you the optimal set-up for when you pick it up.

I hope that gives you some more ideas for safely and efficiently fixing your problem.
1 member likes this
by gehajake
gehajake
I'm on the opposite side of this debate, I don't know how big your pond or how long the dam is but a mini excavator will work for digging it out but you have to have a place to store the dirt because you will have to dig down and get a clean surface before you start replacing the dirt and compacting it effectively, another area where the mini is not going to be able to get proper compaction unless you spend a huge amount of time whacking with the bucket for compaction, which is still not ideal.

I have fixed a number of holy dams over the years, most of them with little extra room on the top of the dam. I go in with tracked loader and basically cut the top of the dam down to past any burrow or damage that has been done, having to get a bucket full of dirt and backing out to the end of the dam and stockpiling it, usually a pile on both ends of the dam, till you have removed all of the damage.

Then you are ready to bring it back in and spread it thin in lifts and compact it as needed.

I have never used anything but the machine to compact it as the top of the dam does not have nearly as much of a leaking problem as the base of a dam. by the time you run back and forth and get a bucket of dirt on each end to rebuild it you get a pretty good amount of compaction, if need be you can traverse across the top of the dam with a full bucket of dirt to add to the ground pressure of the tracks.

I have never had one to leak doing it this way.

Good Luck!
1 member likes this
Today's Birthdays
Chint77, MDHendon, Ponds.org
Recent Posts
Stop Feeding- Will Bass Return to Foraging ?
by Pond Star - 09/15/26 11:42 AM
Gravel Pit Lake - Aeration ?
by WindowRock - 09/15/26 09:49 AM
Field and Stream Feeds?
by Bill Cody - 09/14/26 07:37 PM
Newbie from Colorado
by ewest - 09/14/26 03:34 PM
New Pond Update...
by ewest - 09/14/26 03:27 PM
Too much forage?
by Jst4Fun - 09/14/26 01:09 PM
Lotus variety of nice color
by gehajake - 09/13/26 02:07 PM
Billboard Tarp Pond
by jason7858 - 09/11/26 05:21 PM
LMB in 1 ac pond
by Terry Battisti - 09/11/26 04:10 PM
Previous lurker from Dayton, Ohio!
by ewest - 09/10/26 10:03 AM
Chestnut other trees for wildlife
by Scooter_Trash - 09/09/26 09:54 PM
Introduction
by Terry Battisti - 09/09/26 09:52 PM
Newly Uploaded Images
Uninvited crappie pictures
Uninvited crappie pictures
by fishwife, June 16
Chestnuts this afternoon
Chestnuts this afternoon
by Rangersedge, May 21
Trackhoe
Trackhoe
by Rangersedge, January 24
Thanksgiving RES
Thanksgiving RES
by Shorty, November 27
Nice 12 Inch BGxRES
Nice 12 Inch BGxRES
by Theo Gallus, June 1
F1 Bass stocked 6/24 caught 3/30/25
F1 Bass stocked 6/24 caught 3/30/25
by lafarmpondguy, March 31

� 2014 POND BOSS INC. all rights reserved USA and Worldwide

Powered by UBB.threads™ PHP Forum Software 8.0.1