With a 12 ft high dam,12 ft wideat top, 3/1 slope on front, and 4/1 slope on back with 3 ft deep core trench you are looking at about 7600 yds of dirt to build the dam. Generally it's best to get a price per yard up front and have a fixed price agreement with contractor. I paid 1.30 $ per yard last year when I had a 20,000 yd dam built. If you plan on driving across the dam 12 ft is minimal. You may want to go wider if that is the case. Good luck.