My pond is still filling, so the shoreline is always changing. I keep multiple sets of submerged cedars around the bank by tying 100 lb. nylon string to the cedars, then to a duck decoy that floats on the surface. I always know where my structure is, and can move it any time I want.
I can also remove and replace with new trees when needed.