|
|
|
Forums36
Topics42,113
Posts571,676
Members19,115
| |
Most Online13,561 22 hours ago
|
|
|
0 members (),
5,001
guests, and
226
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: May 2003
Posts: 219
Lunker
|
|
Lunker
Joined: May 2003
Posts: 219 |
The contractor installed the pipe system. The price was around $1000 and included 240' IPS 200 psi pipe and fittings. The overflows are a foot above the permanent water level and a couple of feet below the dam crest. They are bermed out from the dam ends about 150' to direct water away from the back of the dam. The earthen spillway system alone would probably be adequate if the pond was not on a creek with 165 acres of watershed (according to the NRCS estimate). The pond will extend about 1600' from the dam to the upper end, but will be contained mostly within the creek area due to a county road constraint. I'm guessing less than 5 acres of total surface.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
|