At what point do I not even have to bother with a core trench or worry about my dam size? If your daming up a creek and its solid clay soil and its 30-40 foot wide at the top and 90-100 foot wide at the bottom 1 to 3 ratio...There so much clay dirt there?....Do I need to even worry?