Your local NRCS office can probably
give you info on low water crossings.
I had a crossing included in my CRP
plan, but decided against it since I
wanted a crossing outside the CRP area.
I constucted a crossing by having a dozer
taper the banks and then covering the creek
bed with crushed limestone. I know the
NRCS plan called for using concrete.