1-13-07 UPDATE
I'm raining as fast as I can, but it looks like Eddie is gonna kick my butt as we race to the "pool finish line".
We took on what appears to be about another foot of water; this is a pretty substantial jump for my short history. It comes about after 2.5" of rain within 24 hours on completely saturated soil. Using the same building site pic-source reference...

-
We move over to the right, still on the building pad at the extreme right side.

-
Theo's cluster (bottom) has seriously wet feet. Sunil's mound (center structure)is a couple feet from needing a snorkel. The wood duck boxes taunt the slowly expanding shoreline to make my life more miserable as I try to find the time to get back out there and install their predator guards.