This post will be a series taken from the front edge of the man-made peninsula of the building site. The building site is a 3/4 ac. area carved out of the surrounding timber at the south-east end of the pond with a wide, blunt peninsula that bumps out into the original pondsite footprint.
-
-
Nov 2005; clearing was completed 2 months ago. The entire area we view was fairly thick timber 4 months ago (alot of closely spaced "pole" timber). We are planning the dimensions and excavation needs for the homesite. Before leaving this day, I walk back into the timber that will need to be cleared to create the area to waste the 4500-5000 cu yards of soil to build up this proposed building site. I take this pano-pic from the approx area where a home may someday reside. We are looking out at the natural terrain with no excavation. This is the terrain that took me 4 years of searching to find. I could not have done it without Terra-server.
-
-
(fast-forward to next Summer)
7/15/06, after we discovered that our excavator elected to dig these monster holes right out in front of the building site. He had to cut through the 6 or 7 ft of topsoil and silt to get to the thick blue clay deposit beneath. This clay was used to line the front edge of the building site pad that we now stand on. This pad was built up and constructed by moving nearly 5000 cu yards of soil from within the basin. Donna-ski looks up, likely wondering how much these things cost. The PB crew has already weighed in, assuring me that these deep anomolies will yield substantial benefit as bottomscaping.
-
-
7/25/06, excavation is complete and the drain valve was recently closed

-
-
9/22/06, after placing some of the fish structure. A slightly differnet camera angle since we have moved over about 75 feet to the north side of the building site peninsula, still near the front edge. The monster holes, left of frame, have filled.
-
-
10/21/06, not alot of water elevation change but a better pic