Would anyone one care to comment on the pros and cons of facing a dam with rip rap- looks for one thing - I am building a shelf at the bottom of the dam -to hold the rock and am contemplating lining the face of my dam with 3-5 limestone rip rap- have already faced and lined both spillways- dam is about 250 feet long will probably take about 96 yards of rock......