|
Forums36
Topics42,113
Posts571,661
Members19,114
| |
Most Online13,012 Jun 7th, 2026
|
|
|
|
Joined: Jan 2009
Posts: 29,788 Likes: 1295
Moderator Ambassador Field Correspondent  Lunker
|
|
Moderator Ambassador Field Correspondent  Lunker
Joined: Jan 2009
Posts: 29,788 Likes: 1295 |
The liners in other than production ponds are supposed to be covered with 12" soil from bottom to top. You start at the top, do NOT drive on an uncovered liner, and work your way to the bottom. Yes to the 3:1, a customer had a pond dug last year like that. The soil protects the liner from the cover that you will be placing in the pond, and gives plants a place to root.
Make sure the bottom of the pond is rock/stick free before rolling out the liner. Can you get a 1 piece liner or one that is pieced at the factory or do you have to seam pieces together on-site? How much will the liner weigh, and will you need equipment to move it around?
If the soil cannot be cleared of rocks, some companies have a liner pad that goes down first to protect the liner from getting poked from the bottom.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|